Tunnelling projects under urban structures or in geologically challenging regions ask for ultimate precision and reliability. A prerequisite for the realization of such complex projects is the automation and simplification of data recording and processing.

CBP (Controlled Boring Process) is a system for documentation, storage and monitoring, with the function of evaluation and analysis for mechanized tunnelling.

This data-based tunnel drive information system provides the infrastructure to supply data to experts in as near real-time as possible, which they need for their decisions regarding a safe process control.

As a system for monitoring and safety control for the boring process, CBP integrates different data sources.

Fig.: Network picture data sources